New Karak Substation 133/32 KVA - NEPCO
The project is an Electrical substation on AL thania –Al karak
Scope of Work:
Our works is to install electromechanical systems such as :
- HVAC system: the project consist of package unit and air handlers with ducting system and ventilation fans.
The HVAC system have a special Design and high specification to meet the requirements of electrical machine the will be installed inside
- Fire fighting system the type of fire system is FM200.
- Plumbing and domestic.
- Electrical system: Lighting system , fire alarm, power and Emergency lighting system.
Sub contractor for Mohammad Al-eide & sons contracting company.